IEC Engineering Plan

IEC Engineering Plan

Checkpoints

Subjects

Staff placeholders

Checkpoints

Subjects

Staff placeholders

2/5/2019

Installation Completed

cristinapauna Wenhui Zhang Trevor Tao (Deactivated) Jingzhao Ni (Arm Technology China) (Deactivated) ciprian.barbu@enea.com alexandru.avadanii@enea.com

2/12/2019

Automation of the installation

cristinapauna

4/05/2019

Run the automated installation in CI

cristinapauna

4/30/2019

Testing Phase 1

  • Develop/integrate tests in order to make them run against IEC (manual steps)

    • Manually ran k8s e2e conformance test, 97% pass rate

Trevor Tao (Deactivated) xinhuili

5/15/2019

Testing Phase 2

  • Automate in CI the tests from the previous step

    • Currently running a ngnix test in CI to verify the platform is working

Trevor Tao (Deactivated) xinhuili

5/31/2019

Release 1 completed

Trevor Tao (Deactivated) xinhuili

7/30/2019

CentOS support in IEC

Trevor Tao (Deactivated) xinhuili cristinapauna Alexandru Avadanii

10/31/2019

Flannel and SR-IOV Support

Trevor Tao (Deactivated) xinhuili