/
REC Project Minutes 2019.10.10
REC Project Minutes 2019.10.10
Attendees
- Paul Carver
- Radulescu Valentin
- Juha Oravainen
- Alexandru Antone
- Tapio Tallgren
- Tina Tsou (Deactivated)
- shubhamtambi
Agenda
- Update on recent Gerrit activity
- Lots of changes merged recently and lots in progress
- Mix of passing and failing CD jobs
- Second CD lab online with logs available here https://nexus.akraino.org/content/sites/logs/nokia/job/Install_REC_on_Espoo_OE/
- Open Discussion
Minutes
- Discussion of release 2 maturity criteria
- Need to obtain the specific list of which validation framework tests are required to pass for release 2 since tests are still under development and being added throughout October
- Discussion of ORAN vs ORAN-SC. REC currently does not include RIC in the current ISO builds. The RIC is installed in the AT&T CD lab by a Jenkins post-install job. The plan is to eventually incorporate versions of the RIC into specific CI builds of the REC ISO. Once that happens, the REC ISO will be distinct from the TA ISO.
, multiple selections available,