Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 21 Next »

vipin rathi


To be updated.


The IEC Type 4 AR/VR Oriented Edge Stack is requesting maturity review for Akraino release 2.


This page references the requirements in BP Graduation Review Processes and Criteria specifically the table cell for Incubation -> (Mature) on the second row from the bottom of the page.


  • Validation lab check

The IEC Type 4 AR/VR Oriented Edge Stack project contributors have deployed and validated the BP  with a community member validation lab and LF CD lab with the exact HW and SW configuration for which the maturity review is being requested. All validation labs are connected with Akraino LF CI  Logs on the LF CI servers. The logs are pushed from each validation lab's CD testing, and the logs verifies the validation lab check. 

IEC Type 4 AR/VR Oriented Edge Stack successfully  participated in Akraino release R2 and R3's  incubation stage.


  • No labels