When: Monday,1:30 pm UTC,  every one month

Where: https://zoom.us/j/885308032?pwd=K3MwMWtCdGZSU3JYL2V6YlBGVFNKUT09

Organizer:blueprints@lists.akraino.org

Meeting Content (minutes / recording / slides / other):UTC,  every two weeks

Where: https://zoom.us/j/885308032?pwd=K3MwMWtCdGZSU3JYL2V6YlBGVFNKUT09

Organizer:blueprints@lists.akraino.org


Meeting Content (minutes / recording / slides / other):


Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. AUTH-9229 in lynis is solved
    2. KHV002 is solved
Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. AUTH-9229 in lynis is solved
    2. KHV002 is going to solve by update the k8s
Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. two issue in lynis checking
      1. AUTH-9229 
      2. KHV002
Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. need a new EaltEdge env   ---env is ok
    2. need two jekins   – need to process
    3.  lynis should be for matuiry check  --need to process
Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. need a new EaltEdge env   ---env is ok
    2. need two jekins   – need to process
    3.  lynis should be for matuiry check  --need to process
Agenda and MOM:  
Agenda:
  1. discuss about maturity review of EaltEdge
    1. need a new EaltEdge env   
    2. need two jekins
    3.  lynis should be for matuiry check
Agenda and MOM:  
Agenda:
  1. Release 6 tasks - Completed
  2. LFedge EALTEDge setup - Completed
  3. LFEdge demo preparation - In progress


MOM:

Agenda and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Completed
      4. Frequency - Twice in a week
    2. MUNO mode - completed
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - completed
      2. Issue fixes - InPorgress
        1. Vuls - complted
        2. Lyns - complted
        3. Kube-hunter - Inprogress
  3. subcommittee review:
    1. API doc update if required - Completed
    2. upstream matrix update - Completed
    3. Docs update for rel 6 - Completed
    4. Security and Validation exception approval - Inprogress( 1 Kube-hunter is pending)
  4. Update release matrix sheet - Completed
  5. One page data sheet for rel 6 - Completed
  6. Issues Discussion - No open queries

...

  1. Attend Security/Validation Meeting - (meeting notice shared for both security and validation) Sachin/khem
Agenda and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Completed
      4. Frequency - Twice in a week
    2. MUNO mode - completed
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - completed
      2. Obtain Issue reported by tool - complted
      3. Attend Security/Validation Meeting - Sachin
      4. Issue fixes - InPorgress
        1. Vuls - complted
        2. Lyns - complted
        3. Kube-hunter - Inprogress
  3. subcommittee review:
    1. API doc update if required - Completed
    2. upstream matrix update - Completed
    3. Docs update for rel 6 - Completed
    4. Security and Validation exception approval - Inprogress( 1 Kube-hunter is pending)
  4. Update release matrix sheet - Completed
  5. One page data sheet for rel 6 - Completed
  6. Issues Discussion - No open queries

...

  1. Attend Security/Validation Meeting - (meeting notice shared for both security and validation) Sachin/khem
  2. Join and confirm any requirement for validation for release 6 - sachin
Agenda and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Completed
      4. Frequency - Twice in a week
    2. MUNO mode - completed
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - completed
      2. Obtain Issue reported by tool - complted
      3. Attend Security/Validation Meeting - Sachin
      4. Issue fixes - InPorgress
        1. Vuls - complted
        2. Lyns - complted
        3. Kube-hunter - Inprogress
  3. subcommittee review:
    1. API doc update if required - Inprogress
    2. upstream matrix update - Inprogress
    3. Docs update for rel 6 - Completed
    4. Security and Validation exception approval - Inprogress
  4. Update release matrix sheet - Completed
  5. One page data sheet for rel 6 - Completed
  6. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - In-Progress
      4. Frequency - Twice in a week
    2. MUNO mode - completed
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - completed
      2. Obtain Issue reported by tool - complted
      3. Attend Security/Validation Meeting - Sachin
      4. Issue fixes - InPorgress
        1. Vuls - complted
        2. Lyns - complted
        3. Kube-hunter - Inprogress
  3. subcommittee review:
    1. API doc update if required - open
    2. upstream matrix update - open 
    3. Docs update for rel 6 - Open
    4. Security and Validation exception approval - open
  4. Update release matrix sheet - Open
  5. One page data sheet for rel 6 - open
  6. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Open
      4. Frequency - Twice in a week
    2. MUNO mode - In Progress
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - completed
      2. Obtain Issue reported by tool - complted
      3. Attend Security/Validation Meeting - Sachin
      4. Issue fixes - InPorgress
        1. Vuls - complted
        2. Lyns - complted
        3. Kube-hunter - Inprogress
  3. subcommittee review:
    1. API doc update if required - open
    2. upstream matrix update - open 
    3. Docs update for rel 6 - Open
  4. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Open
      4. Frequency - Twice in a week
    2. MUNO mode - In Progress
      1.   Build is setup - - completed
    3. Security/Validation
      1. Security builds with bluval - In progress
      2. Obtain Issue reported by tool - Open
      3. Attend Security/Validation Meeting - Sachin
      4. Issue fixes - Open
  3. subcommittee review:
    1. API doc update if required - open
    2. upstream matrix update - open 
    3. Docs update for rel 6 - Open
  4. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - Completed
      3. Nexus log push - Open
      4. Frequency - Twice in a week
    2. MUNO mode - In Progress
      1.  Installation - Controller is ok, but edge is failing
    3. Security/Validation
      1. Obtain Issue reported by tool - Open
      2. Attend Security/Validation Meeting - Sachin
      3. Issue fixes - Open
  3. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 - Completed
      1. wiki page updated 
      2. code commit status
  2. CI setup for release 6
    1. AIO Mode
      1. AIO mode CI setup - Completed
      2. Test execution along with Jenkins Job - InProgress
      3. Nexus log push - Open
      4. Frequency - Twice in a week
    2. MUNO mode - Open
    3. Security/Validation
      1. Obtain Issue reported by tool - Open
      2. Attend Security/Validation Meeting - Sachin
      3. Issue fixes - Open
  3. Issues Discussion - No open queries

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.5 
      1. wiki page updated 
      2. code commit status
  2. 5G MEC system BP updates - Feng
  3. Issues Discussion


MOM:

Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.3
      1. wiki page updated 
      2. code commit in progress
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.3
      1. wiki page updated 
      2. code commit is completed
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.3
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.3
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 6 requirements
    1. Edgegallery version update to 1.3
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Status
  2. Release 6 requirements
    1. Edgegallery version update
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Status
  2. Release 6 requirements
    1. Edgegallery version update
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Status
  2. Release 6 requirements
    1. Edgegallery version update
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Status
  2. Release 6 requirements
    1. Edgegallery version update
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Status
  2. EG presentation and demo in TSC call  
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - khem/jameel
    1. Security/Validation issue analysis & fix 
      1. KubeHunter - CAP-NET-RAW
    2. Documentation - Gaurav/Khemendra
    3. Upstream matrix – Jameel
    4. API Doc - khem
    5. one page data sheet  
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - khem/jameel
    1. Security/Validation issue analysis & fix 
      1. KubeHunter - CAP-NET-RAW
    2. Documentation - Gaurav/Khemendra
    3. Upstream matrix – Jameel
    4. API Doc - khem
    5. one page data sheet  
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - khem/jameel
    1. Security/Validation issue analysis & fix 
      1. KubeHunter - CAP-NET-RAW
    2. Documentation - Gaurav/Khemendra
    3. Upstream matrix – Jameel
    4. API Doc - khem
    5. one page data sheet  
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - khem
    1. SonoBuoy Integration 
      1. Tool integration with BlueVal - Asked for exception for 1 node setup.
    2. Security/Validation issue analysis & fix 
      1. Vuls - Tool ran and issue identified - 
      2. Lynis - Tool ran and issue identified
      3. KubeHunter - 
    3. Documentation - Gaurav/Khemendra
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - Srini
    1. SonoBuoy Integration 
      1. Tool integration with BlueVal - Asked for exception for 1 node setup.
    2. Security/Validation issue analysis & fix 
      1. Vuls - Tool ran and issue identified - 
      2. Lynis - Tool ran and issue identified
      3. KubeHunter - 
    3. Documentation - Gaurav/Khemendra
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - Srini
    1. SonoBuoy Integration 
      1. Tool integration with BlueVal - Asked for exception for 1 node setup.
    2. Security/Validation issue analysis & fix 
      1. Vuls - Tool ran and issue identified - 
      2. Lynis - Tool ran and issue identified
      3. KubeHunter - 
    3. Documentation - Gaurav/Khemendra
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - Srini
    1. SonoBuoy Integration 
      1. Tool integration with BlueVal - upgrade to latest version InProgress
    2. Security/Validation issue analysis & fix - Srini
      1. Vuls - Tool ran and issue identified
      2. Lynis - Tool ran and issue identified
      3. KubeHunter - 
    3. Documentation - Gaurav/Khemendra - Open
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release Activities - Srini
    1. SonoBuoy Integration 
      1. Tool integration with BlueVal - upgrade to latest version InProgress
    2. Security/Validation issue analysis & fix - Srini
      1. Vuls - Tool ran and issue identified
      2. Lynis - Tool ran and issue identified
      3. KubeHunter - 
    3. Documentation - Gaurav/Khemendra - Open
  2. 5G MEC system BP updates - Feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge integration with EG & other components - Srini - Done
  2. Release Activities - Srini
    1. CI Setup - Done
    2. BlueVal Integration - Done
    3. SonoBuoy Integration 
      1. Tool integration with BlueVal - upgrade to latest version InProgress
    4. Security/Validation issue fix - Open
    5. Documentation - Gaurav/Khemendra - Open
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge with latest EdgeGallery installation MUNO mode - Srini
  2. R4 branching status - Khemendra
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEEdge with latest EdgeGallery installation - Srini
  2. R4 branching status - Khemendra
  3. 5G MEC system BP updates - Feng
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Demo about EALTEEdge with latest EdgeGallery installation - Srini
  2. SmartShelf Demo - Khemendra/Vidya
  3. R4 branching status - Khemendra
  4. 5G MEC system BP updates - Feng
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Demo about EALTEEdge with latest EdgeGallery installation - Srini
  2. SmartShelf Demo - Khemendra/Vidya
  3. R4 branching status - Khemendra
  4. 5G MEC system BP updates - Feng
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EdgeGallery version upgrade status. - Srini
  2. SmartShelf use case enhancement - Khemendra
  3. R4 branching status - Khemendra
  4. 5G MEC system BP updates - Feng
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EdgeGallery version upgrade status. - Srini
  2. SmartShelf use case enhancement - Khemendra
  3. R4 branching status - Khemendra
  4. 5G MEC system BP updates - Feng
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EdgeGallery upgrade status check. - Srini
  2. 5G MEC system BP updates - feng
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EdgeGallery UPF integration framework - https://docs.google.com/presentation/d/1S0Qm09HItZWNlF0jrUjJr1riEzyBH7nI/edit#slide=id.p3
  2. EdgeGallery upgrade status check. - Srini
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Release 5 Requirement Discussion - https://drive.google.com/drive/folders/15AxiuT-wYBhiuqiF9XBolh1ozQnRzKef?usp=sharing
  2. Review of Application landing & source code analysis page - EALT-EDGE Landing ApplicationEALT-EDGE Source code Analysis.
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge (upstream EdgeGallery) Application development & deployment demo (with Smart Retail APP as an example) - Khemendra
  2. XipLink requirement introduction - Tim
  3. R4 code branching status
  4. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge upgrade to EdgeGallery Chocolate release status - Srini
  2. R4 code branching status

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Akraino Technical Virtual Conference Updates - Gaurav
  2. EALTEdge (upstream EdgeGallery) Deployment demo for ROBO use case - Khemendra
  3. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. Discussion on Installation problem - Ruben/Kaique (UFG)
  3. Akraino Technical meet 2021 - Gaurav
  4. Open Discussion

...

Agenda and MOM:  15 Feb 2021
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. EALTEdge BP: Release 4 branching → khem
  3. 5G/MEC BP: Updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenda and MOM:  08 Feb 2021
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. EALTEdge BP: Release 4 branching → khem
  3. 5G/MEC BP: Updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenda and MOM:  01 Feb 2021
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. EALTEdge BP: Release 4 branching → khem
  3. 5G/MEC BP: Updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. EALTEdge BP: Release 4 branching
  3. 5G/MEC BP: Updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge BP: Demo Application development status - Khemendra/Srini
  2. EALTEdge BP: Release 4 branching
  3. 5G/MEC BP: Updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 TSC Review updates - Gaurav
  2. EALTEdge Demo Application development status - Khemendra/Srini
  3. 5G/MEC BP updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 TSC Review updates - Gaurav
  2. EALTEdge Demo Application development status - Khemendra/Srini
  3. 5G/MEC BP updates - Feng/Eagen
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 TSC updates - Gaurav
  2. Release 4 subcommittee review status - Release 4 Planning
  3. 5G/MEC BP updates - Feng
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress Review - Gaurav
  2. Release 4 subcommittee review status - Gaurav
    1. API
    2. Security
    3. Validation
    4. Documentation
    5. Upstream 
  3. TSC Review preparedness
    1. Datasheet
    2. Logs
    3. Release planning page update
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. Release 4 deliverables to various subcomittee review
  3. Subcomittee Updates
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

  1. Kube-Hunter open point discussion with Security WG - Srini/Khem
  2. Upstream WG - Where we need to update - 

    https://wikilf-akraino.akrainoatlassian.orgnet/wiki/display/AK/Upstream+Dependency+Matrix+and+Upstream+Project+Information

    Mail to Upstream WG - Gaurav
  3. R4 Documentation - Release 4 Documentation - Enterprise Applications on Lightweight 5G Telco Edge (EALTEdge)
Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. Release 4 deliverables to various subcomittee review
  3. Subcomittee Updates
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. API Subcomittee template update - Gaurav
  3. Security WG Updates - Srini
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. Security WG Updates - Srini
  3. 5G/MEC BP updates - Feng
  4. Community Updates - Khemendra 
  5. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. Security WG Updates - Srini
  3. Doc WG Updates - Arvind
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. API Subcomittee R4 deliverable - Gaurav 
  3. Security WG Updates - Srini
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. EALTEdge Release 4 Progress
  2. API Subcomittee R4 deliverable - Gaurav 
  3. Security WG Updates - Srini
  4. 5G/MEC BP updates - Feng
  5. Community Updates - Khemendra 
  6. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Akraino Conference Summary
  2. EALTEdge Release 4 Initial Requirements - Gaurav

  3. EALTEdge Release 4 Plan - Gaurav
  4. Security WG Updates - Srini
  5. 5G/MEC BP updates - Feng
  6. Community Updates - Khemendra
  7. Open Discussion

...

Agenta and MOM:  
Agenda:
  1. Last week MoM Update

  2. EALTEdge BP updates - Gaurav

  3. 5G MEC BP update - Feng
  4. Akraino community update - Khemendra

  5. Open discussion

MoM:
  1. Akraino Technical Meetup - Reviewed all activities
    1. slides/demo videos ready
    2. ealtedge slides shared to Alex
  2. feng will share features list - Feng
  3. EALTEdge R4 requirement list creation - Gaurav
  4. Srini need to provide more log for kong issue on arm. kong has latest arm alpine image publish, srini/arvind will try new image and reply with more details.

Agenta and MOM:  

Agenda:
  1. Last week MoM Update

  2. EALTEdge BP updates - Gaurav

  3. 5G/MEC BP Presentation/Updates - Feng

  4. Akraino community update - Khemendra

  5. Open discussion

...

  1. Akraino technical meetup registration - https://www.cvent.com/d/p7qztk/4W?ct=50221cf5-5496-4c34-9ec0-3b52b1bf1204 
  2. Vertical Industry meetup registration - https://lists.akraino.org/g/tsc/message/1126
  3. EALTEdge update
    1. Demo preparation update:  Coding completed, video preparation in-progress
    2. wiki updated forr vault/cert-manager-- done
  4. Check with Alex Reznik on joint talk on MEC implementation in EALTEdge.
  5. Presentation 5g slice in weekly meeting - Feng


MOM:  
1. registration open for Akraino Technial meetup
2. Akraino Blog for R3 -- can have one blog from EALTEdge
3.. akraino technical meetup on september 23-24
- BP presentations
- EALTEdge demo