Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The IEC Type 4 AR/VR Oriented Edge Stack project contributors have deployed and validated the BP  with a community member validation lab and LF CD lab with the exact HW and SW configuration for which the maturity review is being requested. All validation labs are required to connect connected with Akraino LF CI. CI  Logs on the LF CI servers. The logs are pushed from each validation lab's CD testing would be used to verify this , and the logs verifies the validation lab check. 

...