Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Documentation Sub-committee objective is to promote a consistent documentation structure and quality assurance across both the Akraino Project level and all individual Blueprint Families. It also serves the Akraino TSC requirements to follow the Akraino Procedures aiming Quality assurance process and perform the required Documentation review.

...

View file
nameAkraino_Doc_committe_june_2019.pptx
height250


Documentation sub-committee members(From Nov 2023~): 

We have started the process to elect a new chair for the Documentation sub-committee.  The process started on 23 Nov and will continue until Noon 15 Dec 2023 (Pacific)  

The election process is two steps.  The first is for people to self-nominate for the position.  To do this, put a Y in the correct column if you wish to run for Chair.  The second step is to have an election for the position.  If there is only one person who has self nominated, then that person will be chair.  

Note: Please ensure that both the name and email address for each member is listed on each sub-committee membership wiki page in order to properly set up CIVS voting when required. 

Interested parties sign up:

Name

Affiliation

Email

LF ID

Self nominate as Chair (Y/N)Self Nominate as Co-Chair (Y/N)
















































Documentation sub-committee members(From Nov 2020~Nov 2023): 

Note: Election Nov 5 2020- Unfortunately Samir has notified the TSC that he will not be able to continue as Chair.  Thus we are opening up the self-nomination process.  Please put a Y in the Self-nomination column if you wish to be chair.  If not, please put an N.  This process will go until Noon on 12 Nov (Pacific time).  If there is only one self nominee then that person will become chair.  If there are two or more, we will have an election. 

...

Friday 11/20/2020 Pacific

1/ 7:00 am – 7:15 am The AI Edge: School/Education Video Security MonitoringHechun Zhang

2/ 7:15 am – 7:30 am 

...

3/ 7:30 am- 7:45 am- Predictive Maintenance (with a Thermal Imaging Camera, vibration sensors, etc.)

4/ 7:45 am – 8:00 am -  Release 4 Documentation - Enterprise Applications on Lightweight 5G Telco Edge (EALTEdge)

Meeting Notes:

On Friday, 12/04, there had been a substantial failure in planing BPs review. There could be made review only of the BP on Lightweight 5G Telco Edge (EALTEdge). For ther other 3 (three) BPs, the following had been indicated briefly during the session:

...

1/ 7:00 am – 7:15 am PDT- Intergrated Cloud Native Kuralamudhan Ramakrishnan (Deactivated)

2/7:15 am – 7:30 am -  Network Cloud with Tungsten Fabric Sukhdev Kapur

3/ 7:30 am- 7:45 am- IEC Type 4 AR/VR Bart Dong

4/ 7:45 am – 8:00 am - Connected Vehicle Blueprint(Aka CVB) Tao Wang

Meeting Notes:

There were conducted 2 reviews, namely BP IEC Type 4 AR/VR and BP Connected Vehicles (Aka CVB). Both BPs are in co-operation. CVB PTL, Tao Wang elaborated on the issue/status with the BPs APIs and that it had already been reviewed/discussed with the Akraino TSC API Sub-committee and agreed on it. No major issues in the documentation. There had been conveyed a remark on elaborating the status with the UC(s) so that the reader is aware where the BPs are used.

...

1/ 7:00 am – 7:30 am PDT 

2/7:30 am – 8:00 am -  


1/8/2021 schedule

1/ 7:00 am – 7:30 am PDT Public Cloud Edge Interface (PCEI) Blueprint Family Oleg Berzin

2/7:30am – 8:00 am - 

Meeting notes:

The following remarks shall be treated as "recommendations" pursuing enhancements/improvements and in no way treated as "mandatory" to follow and/or implement.

...

1/ 07:00 am - 07:30 am PDT - 5G MEC/Slice System to Support Cloud Gaming, HD Video and Live Broadcasting Blueprint Zigeng Fu Feng Yang

2/ 07:30 am - 08:00 am PDT

...

Documentation review of Blueprint "The AI Edge: Intelligent Vehicle-Infrastructure Cooperation System (I-VICS) is done over e-mail.  Akraino Rel 4 Blueprint Documentation set at link: The AI Edge: Intelligent Vehicle-Infrastructure Cooperation System(I-VICS).

All the required Blueprint's docs for Akraino Rel 4 are available and well prepared. There is provided reference to the utilized Blueprint's Open Source Platform SW (with link to the tool needed for Installation of SW as part of the Platform SW,namely, ROS2 - Robot Operating System 2) and support for 2 UCs namely, "Valet parking" and "SOTIF - Safety of the Intended Functionality".  There is provided reference to HW list for a demo with Lexus RX 450h case. In the Installation Guide" document, the needed HW is specified. The Release document addresses mainly UC SOTIF. The Blueprint's APIs are based on FATE (Federated AI Technology Enabler), which is an Open-Source Project initiated by Webank’s AI Department to provide a Secure Computing Framework to support the Federated AI ecosystem.It seems that the current Blueprint HW and SW configueration is an outcome of Test/Trial/PoC (with Lexus RX 450h). The Blueprint had also added a document "Landing Applications", that provides a list of other Akraino Blueprints that can potentially run (as Application(s)) on the Blueprint (as a Platform). There is also a room for evolvement for the Blueprint to utilize the V2X UC specification(s) in ETSI MEC and 3GPP 5G for V2X SST.

...

Documentation review of Blueprint " Video Security Monitoring Release 4 Documentation" Rel. 4 is done over e-mail. All the required Blueprint's docs for Akraino Rel 4 are available and well prepared. The following remarks shall be considered as advisory and as a recommendation rather as mandaroty and subject to be used a ground for changein the BP's Documentation text:

...

3/ 8:30 am- 8:45 am-

4/ 8:45 am – 9:00 am - Radio Edge Cloud (REC)Paul Carver

Meeting Notes:

...

1/ 7:00 am – 7:15 am PDT- 5G MEC/Slice System to Support Cloud Gaming, HD Video and Live Broadcasting BlueprintFeng Yang

2/7:15 am – 7:30 am PDT - 

...

1/ 7:00 am – 7:15 am PDT- The AI Edge: School/Education Video Security MonitoringHechun Zhang

2/7:15 am – 7:30 am - 

3/ 7:30 am- 7:45 am- AI/ML and AR/VR applications at Edge Vikram Siwach

4/ 7:45 am – 8:00 am- Enterprise Applications on Lightweight 5G Telco Edgekhemendra kumar  Abhijit Dasgupta

...

1/6:00 am - 6:15 am PDT - IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint FamilyJiaXuan Tiejun Chen 

1/6:15 am - 6:30 am PDT - Public Cloud Edge Interface (PCEI) Blueprintcmti CA

1/6:30 am - 6:45 am PDT - Network Cloud and TF Integration ProjectSukhdev Kapur

1/6:45 am - 7:00 am PDT - 5G MEC/Slice System to Support Cloud Gaming, HD Video and Live Broadcasting Blueprint Feng Yang

Meeting Notes:

SmartNIC: Accepted no Comments

...

1/ 7:00 am – 7:15 am PDT- IEC Type 4: AR/VR oriented Edge Stack for Integrated Edge Cloud (IEC) Blueprint Family thorking Mark Shan

2/7:15 am – 7:30 am - Intergrated Cloud Native Kuralamudhan Ramakrishnan (Deactivated)

3/ 7:30 am- 7:45 am- Connected Vehicle Blueprint(Aka CVB) thorking Jim Xu (Deactivated) Mark Shan

...

1/ 7:00 am – 7:15 am PDT- Micro-MECTapio Tallgren, (absent, rescheduled to 11/22)

2/7:15 am – 7:30 am PDT - Connected Vehicle Blueprintxin qiu (not complete,  rescheduled to 11/08)

3/ 7:30 am- 7:45 am- Radio Edge Cloud (REC)Paul Carver (absent, rescheduled to 11/22)

4/ 7:45 am – 8:00 am - Network Cloud and TF Integration Project,  @Sukhdev Kapur ( great start, some requirements are not met, follow up on 11/08)

...

New Final Review Schedule as on 11/01
11/08-  IEC Type 1 - Trevor Tao Cristina Pauna, Type 2-Cristina Pauna, xinhuili,  IEC Type 4,  Wen-Ping Ying Wenhui Zhang Tina Tsou, ELIOT AIOT, jereliu@tencent.com, Network Cloud and TF Integration Project,  Connected Vehicle Blueprintxin qiu,

11/15- SEBA Aaron Byrd,  ICN,  Kuralamudhan Ramakrishnan,

11/20- Radio Edge Cloud (REC)Paul Carver

11/22-  Network Cloud Rover - David Plunkett ,  Network Cloud Unicycle with SR-IOV- David Plunkett,  Network Cloud Unicycle with OVS-DPDK, ELIOT IOT & SDWAN, khemendra kumar,

11/29-  KNI provider Access Edge, Yolanda Robla Mota, , AI ML, AR/VR application at the edge, Vikram SiwachRadio Edge Cloud (REC)Paul Carver, IEC Type 4,  Wen-Ping Ying Wenhui Zhang Tina Tsou, ELIOT AIOT, jereliu@tencent.com,


10/04 -    Radio Edge Cloud (REC)Paul Carver,   ICN,  Kuralamudhan Ramakrishnan (Deactivated),  Network Cloud Unicycle with SR-IOVDavid Plunkett

Network Cloud and TF Integration ProjectSukhdev Kapur

10/11-   Micro-MECTapio Tallgren, SEBA Julie Lorentzen 

...

10/25-AI/ML, AR/VR application at the edge, Vikram Siwach, ELIOT AIOT, IOT, SDWAN, Guoxu (Jeremy) Liu, khemendra kumarNetwork Cloud and TF Integration Project, Sukhdev Kapur, KNI provider Access Edge, Yolanda Robla Mota, Connected Vehicle Blueprintxin qiu , Network Cloud Rover, David Plunkett Starling X Bill Zvonar, IEC Type 2 Paunaxinhuili,

...

Documentation Readiness Discussion for Rel 1

04/26 7:00 am PDT – Unicycle for NEC Rover Blueprint Proposal for Addition to Network Cloud Blueprint Family -david.plunkett@att.com

05/03  7:00 am PDT-  OVS-DPDK Unicycle Dell Blueprint Proposal-  Rakesh Bohra <rakesh.bohra@ericsson.com>, 

                                   StarlingX Far Edge Distributed Cloud - Bill Zvonar,

                                   Eliot- Abhijit

05/10 7:00 am PDT – Kubernetes-Native Infrastructure for Edge (KNI-Edge) Family, Frank Zdarsky, Eliot- Abhijit

05/17 7:00 am PDT –  Edge Video Processingadnan.saleem@radisys.comIEC Type 1 for Integrated Edge Cloud (IEC) Blueprint Familytrevor.tao@arm.com

05/24 6:00 am PDT –

IEC Type 2 for Integrated Edge Cloud (IEC) Blueprint Familylxinhui@vmware.com 

 Edge Video Processingadnan.saleem@radisys.com

 IEC Type 1 for Integrated Edge Cloud (IEC) Blueprint Familytrevor.tao@arm.com

Eliot IoT Gatewaykhemendra.kumar@huawei.com 

         Radio Access Cloud pcarver@att.com



  7:00 am PDT

...