- PCEI Deployment Tests
Described in the PCEI R6 Installation Guide
- PCEI End-to-End Validation Tests
Described in the PCEI R6 End-to-End Validation Guide
- BluVal Tests
Described in the BluVal Test section of this document.
...
For end-to-end functional verification, a simulated IoT Client was provided. Please refer to PCEI R6 End-to-End Validation Guide.
Test API description
Test APIs NOT USED (except BluVal Robot)
...
Test | Description | Result | Reference |
---|---|---|---|
EMCO Deployment, CDS, CBA | Install EMCO Orchestrator | Pass | |
Edge Cluster Deployment | Deploy Edge K8S Clusters | Pass | PCEI R6 Installation Guide |
EMCO UI Access | Access EMCO UI | Pass | PCEI R6 Installation Guide |
Test Procedure
PCEI R5 End-to-End Validation Guide.
Expected output
All tests pass
...
Refer to sections of the following documents for detailed test results:
PCEI R6 End-to-End Validation Guide.
Feature Project Tests
NOT PERFORMED
...
sysctl -w net.ipv4.conf.all.accept_source_route=0
sysctl -w net.ipv4.conf.default.accept_source_route=0
K8S Conformance
Exception Requested:
...
Bottlenecks/Errata
Please refer to PCEI R6 Release Notes