Link to process-SC review record Graduation reviews
Blueprint species:
Use Case Attributes | Description | Informational |
Type | New Blueprint for VR/AR on the Network Edge |
|
Blueprint Family | Integrated Edge Cloud (IEC) |
|
Use Case | Deployment of generic edge end and cloud environment for VR/AR cloud streaming |
|
Blueprint proposed Name | IEC Type 4: AR/VR oriented Internet Edge Stack for Integrated Edge Cloud (IEC) Blueprint Family |
|
Initial POD Cost (capex) | NVIDIA RTX GPUs, Chelsio T580-CR NICs. less than $120k (3 nodes) |
|
Scale & Type | Generic blueprint PoC:
Large scale deployment:
|
|
Applications | Generic blueprint POD: Small scale cloud AR/VR rendering farm with generic SO. Production/commercial service:
|
|
Power and memory restrictions | N/A |
|
Infrastructure orchestration | Docker 18.09.4 or above (19.03 may be needed to run windows container with nVidia GUP support) and K8s 1.14.1 or above- Container Orchestration, VMWare VM OS - Ubuntu 18.04.2, windows server 2019 Under Cloud Orchestration - Airship v1.0 (TBD) |
|
SDN | Calico and K8s, Memcached load balancer (optional) |
|
Workload Type | VR and AR applications with split rendering runtime running inside Containers or VM |
|
Additional Details | The test configuration consists of 3 machines connected using ethernet switch: a master and 2 worker nodes, each with TBD processor clocked at TBD GHz, with TBD GB of RAM and Ubuntu operating system for master, windows server 2019 or later for worker. MTU of 1450B is configured (to compensate for GTP tunnel header). Each windows server preconfigures with 2-3 VMs with fixed GPU allocation per VM. |
...